1 x Framing screws TEKOR Countersunk Head With Serration T40 8X300 Thread Length: 100 cut Type 17 Drilling Point Zinc
1 x Framing screws TEKOR Countersunk Head With Serration T40 8X300 Thread Length: 100 cut Type 17 Drilling Point Zinc
1 x Framing screws TEKOR Countersunk Head With Serration T40 8X300 Thread Length: 100 cut Type 17 Drilling Point Zinc
1 x Framing screws TEKOR Countersunk Head With Serration T40 8X300 Thread Length: 100 cut Type 17 Drilling Point Zinc
1 x Framing screws TEKOR Countersunk Head With Serration T40 8X300 Thread Length: 100 cut Type 17 Drilling Point Zinc
1 x Framing screws TEKOR Countersunk Head With Serration T40 8X300 Thread Length: 100 cut Type 17 Drilling Point Zinc
1 x Framing screws TEKOR Countersunk Head With Serration T40 8X300 Thread Length: 100 cut Type 17 Drilling Point Zinc
1 x Framing screws TEKOR Countersunk Head With Serration T40 8X300 Thread Length: 100 cut Type 17 Drilling Point Zinc
1 x Framing screws TEKOR Countersunk Head With Serration T40 8X300 Thread Length: 100 cut Type 17 Drilling Point Zinc
1 x Framing screws TEKOR Countersunk Head With Serration T40 8X300 Thread Length: 100 cut Type 17 Drilling Point Zinc
1 x Framing screws TEKOR Countersunk Head With Serration T40 8X300 Thread Length: 100 cut Type 17 Drilling Point Zinc
1 x Framing screws TEKOR Countersunk Head With Serration T40 8X300 Thread Length: 100 cut Type 17 Drilling Point Zinc
1 x Framing screws TEKOR Countersunk Head With...
1 x Framing screws TEKOR Countersunk Head With...
1 x Framing screws TEKOR Countersunk Head With...
1 x Framing screws TEKOR Countersunk Head With...
1 x Framing screws TEKOR Countersunk Head With...
1 x Framing screws TEKOR Countersunk Head With...
1 x Framing screws TEKOR Countersunk Head With...
1 x Framing screws TEKOR Countersunk Head With...
1 x Framing screws TEKOR Countersunk Head With...
1 x Framing screws TEKOR Countersunk Head With...
1 x Framing screws TEKOR Countersunk Head With...
1 x Framing screws TEKOR Countersunk Head With...

1 x Framing screws TEKOR Countersunk Head With Serration T40 8X300 Thread Length: 100 cut Type 17 Drilling Point Zinc

2040830002_1
In stock 19437 Pièces
€1.70 Incl VAT
Decreasing prices by quantity
Number of pieces 1 5 20 50 200
Lot price VAT included €1.70 €5.05 €20.25 €46.15 €184.60
Framing screws TEKOR Countersunk Head With Serration T40 8X300 Thread Length: 100 cut Type 17 Drilling Point Zinc Plated
Packaging
  • 1 unit
  • 5 units
  • 20 units
  • 50 units
  • 200 units

Dimensions shown in millimeters (mm)
 
Diameter
8
Length
300
Drive Type
Torx
Size Drive Type
T40
Material
Steel
Coating
ZINGUE White
COLOR
Grey
Brand
Chipboard Screw Tekor
Product Family
Wood Screws
Sub product family
Countersunk Head
Tip
Drilling Point Type 17
Unit weight
64 GR
19437 Items
3663072202306

Application

  • Structural timber assemblies / light framing: rafters, purlins, joists, frame studs, reinforcements, braces
  • Timber frame construction: fixing of frame components and bracing
  • Assembly of pergolas, carports, shelters, wooden frames
  • Fixing panels to a wooden structure (OSB/CTBX)
Framing screws TEKOR Countersunk Head With Serration T40 8X300 Thread Length: 100 cut Type 17 Drilling Point Zinc Plated
Diameter = 8, Length = 300, Coating = Zinc Plated, Material = Steel, Drive Type = Torx, Product Family = Wood Screws, Size Drive Type = T40, Brand = Chipboard Screw Tekor


dimensional guide (mm)
Diameter 5 6 8 10
Head diameter 10 12 14 18

Other Reference : 3617500558633 08328 3663072202306
Mathurin O. (vis-express.fr)
2026-07-12

Floor assembly Douglas fir floor assembly with opening creation


Fournier V. (vis-express.fr)
2026-07-12

In ten years, he went from an unknown activist in Seine-Saint-Denis to the politician most talked about in France. How is such a rapid rise possible, and what does it reveal about how a political figure is truly built? This documentary retraces Jordan Bardella's journey based on verifiable facts: his origins in Drancy and Saint-Denis, his joining the National Front at sixteen, his clear rise within the National Rally, and the decisive role played by the party's communication strategy in shaping his image. We draw on journalistic work from the INA (National Audiovisual Institute), Le Monde, and Public Sénat, as well as analyses by political scientists, to distinguish myth from documented reality. From the patriotic suburbs to the eve of the 2027 presidential election, including Marine Le Pen's conviction in the European parliamentary assistants case, this historical investigation sheds light on the mechanisms of modern political communication, the normalization of parties, and the transfer of power. Factual and sourced analysis. No speculation presented as fact. Subscribe so you don't miss future investigations.


Gerard D. (vis-express.fr)
2026-05-03

Assemblage de planches en chêne


Julien C. (vis-express.fr)
2026-04-26

Assemblage d'une pergola Jonction entre deux pannes de 250mm


Julien B. (vis-express.fr)
2026-04-19

Fixation de poutre sur ferme


16 other products in the same category:

Product added to wishlist